Construction Dates: April 2024 – August 2024

Location:

Simcoe, ON

This notice is to provide public notification of the pending reconstruction of Talbot Street, from Chapel Street to Young Street, in Simcoe.

The construction drawings are available for reference at the following link to the project page;

https://www.norfolkcounty.ca/living/construction/

Key Contact Information

Contractor

Elgin Construction Company Ltd.

Cullen Ackland

519-631-5041

[email protected]

Consultant

Douglas Vallee Limited

Greg Smith, P.Eng.

(519) 410-0633

[email protected]

Norfolk County

Scott Zerbes, Project Manager

(519) 420-9367

[email protected]

After hours emergency 1-877-298-5888

Project Scope

Talbot Street North – Young Street to Robinson Street

      • Replacement of sanitary sewer and services
      • Replacement of watermain and water services to property line
      • Replacement of the storm sewer and appurtenances
      • Replacement of concrete curb and gutter, sidewalk and asphalt

Talbot Street South – Chapel Street to Robinson Street

      • Replacement of sanitary sewer and services
      • Replacement of watermain and water services to property line
      • Replacement of the storm sewer and appurtenances
      • Replacement of concrete curb and gutter, sidewalk and asphalt
      • Installation of a three way stop condition at the Talbot and West Street intersection along with the removal of the stop sign at Court Street on Talbot.

Construction Schedule

The project has been awarded to Elgin Construction and is scheduled to start on or around April 15, 2024 and continue through to the end of July 2024.

Information for Homeowners

Driveway Access and On-Street Parking

The contractor is required to maintain access to all homes during construction.  There will be occasions when you may experience some delays, lack of service and inconvenience. Every effort will be made by the contractor to minimize these occurrences as well as communicate when they are to occur.

We do ask that you refrain from parking on the street during construction activities as this can delay things and prolong the construction period

Sanitary Sewer Servicing

Replacement of the sanitary sewer is being completed as part of this project.  You should experience no interruptions with your sanitary sewer during the project.

Watermain Servicing

The replacement of the watermain is being completed as part of the project. Your existing water service will be connected at the property line to a new service from the watermain.  The contractor and our site inspector will notify you of any interruptions to your water supply that will be required to complete this work.

The contractor will be providing a temporary water system for this project. This system will be installed and tested to the same standards of Norfolk County as permanent installations. The temporary distribution system will be connected to your existing service.  This temporary system will allow for the contractor to complete the project efficiently and safely while maintaining water supply to you.

Any disruption during the connection of your water service to the temporary system or to the new permanent system should be minimal.  There may need to be interruptions of longer duration to allow for the main line connections of the new system to the existing system.  You will be notified in advance of these interruptions and provided with some indication of the anticipated duration.

 

Garbage and Recycling

The Contractor is required to maintain the pickup of garbage bags, garbage containers and recycling boxes left at the curbside from abutting residential or commercial properties within the limits of construction.

This may include the picking up of bags, containers and recycling boxes and placing them at a location convenient for pick up by County contractor.  If this is required, empty garbage containers and recycling boxes shall be returned to the respective property owners on the same day.

Please clearly mark all containers and recycling boxes with your address so that they may be returned to the correct location.   All regularly scheduled garbage and recycling pickups shall be maintained regardless of whether the Contractor is working on that day.

Lawn Sprinkler Systems

We ask that if you have underground lawn sprinkler systems, that you please mark the locations of sprinkler heads adjacent the road and/or sidewalk.

Tree Removals

With every construction project comes the removal of some trees for various reasons. Some are at the end of their life span, while others have water and sanitary services within the root areas that would be damaged by construction. Trees deemed to present a hazard or are in conflict with construction activities will be removed as part of this project. Norfolk County will evaluate the potential for appropriate tree planting opportunities after construction is complete.

Pre-condition Property Surveys

Elgin Construction has retained dBA Services Inc. to complete pre-condition surveys as part of this reconstruction project.  This survey is strongly recommended by Norfolk County as it serves to protect the homeowner, contractor and county should any claims arise during construction.  The pre-condition survey notice will be delivered to your door in the upcoming days with directions how to arrange an appointment.

Construction Drawings