Project Construction Budget – $1,479,025
Proposed Start Date – Mid April 2024
Estimated Completion Date – Mid August 2024
It is our intention to minimize the impact of this vital infrastructure work on the public and vehicular traffic. If you have any questions or concerns regarding the work being completed, please reach out to the appropriate individual shown above.
Project Description
The Big Creek 3rd Concession Bridge located on 3rd Concession Road South Walshingham approximately 3.5km west of Norfolk County Highway 59, which spans Big Creek, requires a major rehabilitation to the bridge structure.
The work will include bridge jacking and bearing replacement, bridge deck overlay, bridge railing and guide rail replacement, concrete repairs, road and asphalt restoration, and associated traffic control.
Information for the Public
Traffic Management
In order to expedite the work in a safe environment, vehicular traffic control measures will be in effect. During the construction, the bridge will be closed to traffic and a detour route will be in place. Traffic will be detoured using Norfolk County Road 23, 2nd Concession Road and Norfolk County Highway 59.
Contractor
Urbanlink Civil Ltd.
Matthew Formica
(905) 329-5063
Email: [email protected]
Consultant
G. Douglas Vallee Limited
Michael Rapai, P.Eng
(519) 426-6270
[email protected]
Norfolk County
Project Manager
Jeff Demeulemeester, CET
(519) 426-5870 ext. 8087
[email protected]
Project Location