Contractor
FINNBILT General Contracting Ltd.
Glenn Finnie
(519) 272-1622
Email: [email protected]

Consultant
G. Douglas Vallee Limited
Ryan Elliott, P.Eng
(519) 426-6270
Email: [email protected]

Norfolk County
Project Manager, Jeff Demeulemeester, CET
(519) 426-5870 ext. 1613
Email: [email protected]

 

After-hours emergency:  1-877-298-5888

        


Project Construction Budget – $3,723,000

Proposed Start Date – March 2021

Estimated Completion Date – May 2022

For detailed information regarding the project, what to expect during construction, and the progress of construction, please visit www.gdvallee.ca/public-consult. The site will be updated regularly during construction.

It is our intention to minimize the impact of this vital infrastructure work on our lives and economy.  If you have any questions or concerns regarding the work being completed, please reach out to the appropriate individual shown above.


Covid-19 Status

Norfolk County has declared that the Constable John Verral Memorial Bridge Replacement project is an essential project.  Work is proceeding under this declaration.  The contractor will be required to provide a Covid-19 Health and Safety Policy for completing this work under current recommended guidelines.  This includes social distancing both with other crew members and the public who may approach the job site.  We respectfully request that this social distancing be reciprocated by the public towards crew members on site.

 

Project Description

The Constable John Verral Memorial Bridge located on Queensway East (Hwy 3), which spans the Lynn River in the town of Simcoe, will be replaced with a new 5 lane bridge using a 2-staged construction approach.  Stage 1 construction – south half of bridge, Stage 2 construction – north half of bridge.

The work will include the full replacement of the bridge superstructure, sidewalk replacement, reinstatement of the pedestrian path under the bridge, storm sewer outlet replacement, road and asphalt restoration, and associated traffic control.

 

Information for the Public

Traffic Management

In order to expedite the work in a safe environment, pedestrian and vehicle traffic management restrictions will be in effect. During construction, one eastbound lane, one westbound lane, and access to all residences and businesses will be maintained, however, some traffic movements (e.g.: left turns in and out) may not be permitted within the construction traffic management zone. Access to entrances on the north side of Queensway East from Norfolk Street to Gilbertson Drive will be accessed by right turns from the westbound lane only.  Additional signage to assist in directing vehicular traffic will be in place.

Garbage and recycling collection services will remain the same.  Please have your garbage and recycling curbside by 7:00 am the day of your regular collection schedule. Municipal addresses should be labeled on all recycling boxes so that they may be returned to the correct address.

 

Project Location

Birds eye view of Cst. John Verral Memorial Bridge Replacement Map of location of John Verral Memorial Bridge Replacement